Energy and utilities
Substation N – Vinehaven Drive / Copperfield
Substation N, 1050 Vinehaven Drive, Concord, Cabarrus County
Verified Project Information
Summary
The City of Concord is developing Substation N at 1050 Vinehaven Drive to add a 100 kV delivery point and 13 kV retail substation, increasing electric capacity and reliability for the growing Copperfield area.
Current stage: Under construction.
Current condition: Active.
Key Facts
Estimated Cost
No overall project cost is published.
Latest Progress
2025-11-13: Southeastern Consulting Engineers recommended Pike Electric's low responsive bid of $660,924.74 for Substation N subsurface construction; the bid review lists a 130-day delivery period.
Project Leaders
City of Concord
Project owner, Project sponsor
Project Funding
Funding type: Public · Status: Allocated
City of Concord: $660,925 (2025)
City of Concord: $184,644 (2025)
City of Concord: $4.33 million (2024)
City of Concord: $250,384 (2024)
Timeline
Pike Electric recommended for subsurface construction
Southeastern Consulting Engineers recommended Pike Electric's low responsive bid of $660,924.74 for Substation N subsurface construction; the bid review lists a 130-day delivery period.
Stage after event: Under constructionSitework phase listed to begin
An independent construction listing reports an April 17, 2025 start date for Substation N sitework and demolition. The date is retained as secondary reporting pending a City construction notice.
Stage after event: Under constructionSitework and grading awarded
Concord City Council recommended awarding Carolina Siteworks $184,644 for sitework and grading at 1050 Vinehaven Drive for Substation N.
Stage after event: Under constructionCity authorizes circuit-switcher purchase
The City authorized purchase of two 115 kV circuit switchers for Substation N through a Sourcewell cooperative contract at a quoted price of $250,384.28.
Stage after event: Funded or programmedCity awards major Substation N equipment packages
Concord City Council awarded $4,334,604 in material bids for Substation N equipment including steel structure, transformers, circuit breakers, and metal-clad switchgear.
Stage after event: Funded or programmed
Geography
Project site / location
- Concord, NC
- Cabarrus County, NC
Affected / impact geography
- Concord, NC
- Cabarrus County, NC
Map
ExactApproximate
Solid geometry is exact. Dotted geometry and dotted-outline markers are approximate. Multiple markers may show independently verified locations; they are not connected and do not establish a route or alignment.
Visitor Feedback
62 visitor views
Keep this project current
Saw something different from the project information here?
Noticed new construction activity, changes, or information that differs from what we've reported? Share your observation to help us keep this project up to date.
Visitor Feedback
62 visitor views
Government Sources
- Primary
- Primary
- Primary
- Primary
- Primary
Media Coverage
No approved media coverage is currently published.