Charlotte Area Transit System (CATS) is developing a park-and-ride mobility hub on Hambright Road in Huntersville, near I-77. Current CATS materials describe more than 450 parking spaces, express-bus connections, pedestrian and bicycle amenities, and shared-mobility features. Based on the current CATS project page and human review, the project is active in the pre-construction bidding and permitting stage.
Current stage: Final design.
Current condition: Active.
Key Facts
Estimated Cost
No overall project cost is published.
Latest Progress
2026-05: The current CATS project page places bidding and permitting from May through August 2026. Human review directs that this current CATS timeline establish an active pre-construction stage; it does not establish a construction contract award or physical construction start.
Project Leaders
City of Charlotte
Project owner, Project planner, Project sponsor
Project Funding
Funding type: Public · Status: Allocated
City of Charlotte: $11.70 million (2026)
City of Charlotte: $2.60 million
Timeline
CATS timeline enters bid and permitting stage
The current CATS project page places bidding and permitting from May through August 2026. Human review directs that this current CATS timeline establish an active pre-construction stage; it does not establish a construction contract award or physical construction start.
Stage after event: Final designCATS budget outlook lists FY 2027 investment
CATS's FY 2027 budget outlook labels $11.7 million as the Hambright Park & Ride FY 2027 budget and $2.6 million as previously appropriated. The slide does not establish whether these budget figures are comparable with the programmed TIP total or the City's $10 million-plus construction opportunity estimate, so no combined or total project cost is inferred.
State TIP records phase funding
The NCDOT Board archive lists TA-6724 engineering, right-of-way, and construction funding across FY 2025 and FY 2026, totaling $12.672 million. The 2026-2035 non-highway TIP reports $12.681 million under funding codes that include CMAQ, BGDA, local, and state sources. These are programmed phase/funding figures, not a verified total-project-cost determination.
Stage after event: Funded or programmedCATS reports design and construction schedule
CATS reported the project at approximately 30-percent design and forecast construction from July 2025 through December 2026. Axios independently reported the same earlier schedule and an approximately 500-space concept. The later CATS page lists a materially later construction period.
City authorizes design services
City Council authorized a design and construction-administration contract of up to $1.6 million with AMT Engineering. The Council description called for an approximately 500-space park-and-ride and mobility hub serving Huntersville and connecting to I-77 Express Bus service.
Stage after event: Preliminary design or environmental reviewCity reports early project cost estimate
A CATS budget outlook described the project as in design, estimated total cost at about $12.7 million, and identified a proposed FY 2022 appropriation of $1,427,446. These are historical planning figures, not current confirmed total cost or actual expenditure.
City approves Hambright site purchase
Charlotte City Council approved acquiring a 23-acre NCDOT property at 11100 Hambright Road for $1 for a future CATS park-and-ride. The action described a 511-space lot and bus bay; the cited acreage differs from the current GIS parcel area and is retained as the historical description.
Stage after event: Proposed or conceptual
Geography
Project site / location
- Huntersville, NC
- Mecklenburg County, NC
Affected / impact geography
- Huntersville, NC
- Mecklenburg County, NC
Map
ExactApproximate
Solid geometry is exact. Dotted geometry and dotted-outline markers are approximate. Multiple markers may show independently verified locations; they are not connected and do not establish a route or alignment.
Visitor Feedback
82 visitor views
Keep this project current
Saw something different from the project information here?
Noticed new construction activity, changes, or information that differs from what we've reported? Share your observation to help us keep this project up to date.
Visitor Feedback
82 visitor views
Government Sources
- Primary
- North Carolina Department of TransportationBoard of Transportation July 2025 Meeting Archive - STIP Modifications2025-07Primary
- Charlotte Regional Transportation Planning Organization2026-2035 State Transportation Improvement Program - Non-Highway Projects2025Primary
- Primary
- Primary
- Primary
- Primary
- City of CharlotteHambright Park and Ride - CATS Project PagePrimary
- City of CharlotteHambright Park and Ride Construction Project - Contract OpportunityPrimary
- Mecklenburg CountyMecklenburg County Tax Parcel Boundaries - Feature LayerSupporting
Media Coverage
Axios · 2024-07-10
CATS to build 500-space park and ride in Huntersville for bus rapid transit commuters (opens original source in a new tab)
Axios reports CATS's approximately 500-space Hambright Park and Ride design, planned mobility and bus connections, and an earlier 2025-2026 construction schedule.