I-85 Widening – Gaston County
Location not confirmed
Verified Project Information
Summary
The I-85 Widening – Gaston County program proposes widening approximately 10 miles of I-85 from six to eight lanes between U.S. 321 in Gastonia and N.C. 273 in Belmont, with interchange, roadway-bridge and railroad-bridge improvements.
Current stage: Final design.
Current condition: Active.
Key Facts
Estimated Cost
No overall project cost is published.
Latest Progress
2026-03-20: NCDOT's current project page lists phase-specific estimates of $587.705 million and $65.3 million for the Exit 17 section, $567.805 million and $41.9 million for the Exit 23–27 section, and $240 million for the bridge-replacement section. These estimates are retained separately rather than summed into an inferred program total.
Project Leaders
North Carolina Department of Transportation
Project owner, Project sponsor
Project Funding
Funding type: Public · Status: Allocated
U.S. Department of Transportation: $100.00 million (2022)
Other funding contributors: North Carolina Department of Transportation
Timeline
NCDOT publishes current phase estimates
NCDOT's current project page lists phase-specific estimates of $587.705 million and $65.3 million for the Exit 17 section, $567.805 million and $41.9 million for the Exit 23–27 section, and $240 million for the bridge-replacement section. These estimates are retained separately rather than summed into an inferred program total.
Stage after event: Final designGeotechnical investigation begins ahead of widening
NCDOT scheduled overnight lane closures to support geotechnical investigation for the future I-85 widening, including the South Fork Catawba River bridge and related structures in the Exit 23–27 segment.
Stage after event: Final designNCDOT awards Exit 23–27 design-build contract
NCDOT awarded Lane Construction a $337 million design-build contract for the four-mile segment between N.C. 7/Exit 23 and N.C. 273/Exit 27. Design work was underway and construction was expected to begin in summer 2026; this contract covers one section of the broader program.
Stage after event: Final designI-85 Futures receives $100 million INFRA award
The U.S. Department of Transportation awarded NCDOT a $100 million INFRA grant for the I-85 Futures scope, which includes widening, interchange and bridge improvements and multimodal and intelligent-transportation elements.
Stage after event: Funded or programmedNCDOT holds public meetings on proposed widening
NCDOT presented the proposed six-to-eight-lane widening, interchange improvements and bridge replacements for the Gaston County corridor during the project's public-meeting phase.
Stage after event: Preliminary design or environmental review
Geography
Project site / location
No site geography relationship is published.
Affected / impact geography
No separate impact geography is published.
Map
No physical geometry is currently eligible for public mapping.
Visitor Feedback
80 visitor views
Keep this project current
Saw something different from the project information here?
Noticed new construction activity, changes, or information that differs from what we've reported? Share your observation to help us keep this project up to date.
Visitor Feedback
80 visitor views
Government Sources
- North Carolina Department of TransportationI-85 Widening – Gaston County – Project Highlights2026-05-13Primary
- Primary
- Supporting
- North Carolina Department of TransportationLane Closures Scheduled for Interstate 85 in Gaston County2025-10-17Supporting
- Primary
- Supporting
- Primary
- Supporting
- North Carolina Department of TransportationNCDOT State Maintained Roads Feature LayerPrimary
Media Coverage
Axios · 2022-09-16
I-85 widening project gets $100M federal boost (opens original source in a new tab)
Axios reports on the $100 million INFRA award, the 10-mile six-to-eight-lane widening, congestion context, multimodal features and a then-current 2030 completion outlook.